OperationSTART - Host Maintenance pt. 2 – Detail pemeliharaan

Semua sistem beroperasi

Host Maintenance pt. 2

Selesai
Dijadwalkan untuk April 16, 2022 pada 14.00 – April 17, 2022 pada 02.00

Mempengaruhi

Forms

Pemeliharaan dari 2:00 PM ke 2:00 AM

Pembaruan
  • Selesai
    April 17, 2022 pada 02.00
    Selesai
    April 17, 2022 pada 02.00

    The maintenance period has ended.

  • Sedang berlangsung
    April 16, 2022 pada 14.00
    Sedang berlangsung
    April 16, 2022 pada 14.00

    Maintenance is now in progress

  • Direncanakan
    April 16, 2022 pada 14.00
    Direncanakan
    April 16, 2022 pada 14.00

    Our web host, Hosturly is performing maintenance. See the details below.

    General Maintenance – April 16th, 2022

    Services Affected: VPS, Web, Dedicated, & Colocation

    Start Time: 7AM PDT

    Estimated End Time: 7PM PDT

    Summary: We are reorganizing our main rack in Chicago to allow for the installation of new equipment. During this time, we will also be re-documenting our infrastructure to allow for better organization across all systems.

    Impact on Customer: There will be downtime for this maintenance. We anticipate having minimal downtime per server. Our current plan is to take each server within our infrastructure offline across the two days. Throughout the maintenance time period across the two days, you will experience drops in connectivity as we will be moving servers around the data center, resulting in a power and connectivity loss while we reorganize. Although this is an extensive task, we will have a Hosturly representative on-site, which will improve efficiency.